tisdag 28 februari 2017

Meetings with supervisor (summary)


Below are some of the pointers discussed during the meetings with our supervisor. These have been presented during meeting but are posted here in order to have them documented.

Meeting with supervisor Chris Peters 9/2 - 2017

Since last time
  • PPD: 2 points 
  • Try to reuse from the extensive PPD we created. 
  • New requirements: Reduced 
  • Show prototype: CSC  
  • Color, think about this
  • Toggle button
Findwise
  • Licensing issues? 
  • Sustainable for the system - duration. 
  • Third party library - d3 library, check the license. 
  • Show Findwise- license, perhaps draw a document. 
Documentation 
  • Create Use cases
  • Detail 2.1.5
  • Risk/need/priority 
  • Dependencies 
  • Three columns 
  • IEEE 830 - not every section is important. add do not change.
  • Sketches 
  • Visualization Filtering Task —> Visualization method 
  • Priorities and stretch goals.

Meeting with supervisor Chris Peters 20/2 - 2017

Other project
Had a meeting with the other group and talked about similarities. 
New meeting will be held after the other group are done with their project. 

Group issues
  • Now nine. 
  • Think about how more people can leave and make a contingency plan
  • Update roles (has been done). 
Documentation 
  • Template has been created 
  • Assumptions and Dependencies: libraries, people, technical, team members, licenses, plattform, KTH-system (api)
  • Performance requirements: arbitrary value (5 seconds), threshold, how long does it take to run. Check with the demo. Optimization and basic plattform. Minimal plattform.  
  • Design constraints: 
  • Specific requirements: alla subsections.  
  • Software system quality attributes: look through the document  
Use cases: 
  • Prioritize so we know direction. 

Meeting with Chris 27/2 - 2017 

UML Class Diagram 
  • Not part of SRS1 but still a grading criteria. Suppose to be 3.7. 
  • Ask Karl about this on KTH Social. 
Loss of three members 
  • Minimum requirement: focus on Findwise. 
  • Prioritized - detail this in Use cases.
  • Impact of that - SRS document. 
Next meeting 
  • Friday the 10th of March - feedback for document. 
  • Reflective / motivate content should be differentiated from the main body of the text. 
Focus on the project as well.
  • Create a nice product and do not only focus on the documentation. 
  • Balance documentation/product wisely. 
  • Try to reuse content from the PPD. 
  • This is a core development phase, do not forget the product(!). 


Meeting 8: Group Leaders

February 27th, 2017

The eight group leader meeting touched upon several points. The upcoming Sprint was discussed. Niklas will have a new meeting with the group of master students creating a similar project once they are done. The different parts of the documentation have been divided and can be found on the Trello page. Emmeli will contact Findwise regarding use cases. Points that will be discussed on the next group meeting can be found in the meeting's minutes below.

See: Minutes leaders 8

onsdag 22 februari 2017

Meeting 5: Whole group

February 22nd, 2017

During the fifth group meeting the group discussed the following. New roles and how the group now deals with the matter of being nine group members instead of twelve. Niklas shared his thought regarding the master group's project. Jonathan demonstrated the prototype that the prototype group have been working on. Furthermore, the new sprint cards were discussed and group members could weigh in on if they wanted to convey anything further to Simon.

See minutes: Meeting 5

Meeting 7: Group Leaders

February 22th, 2017

The leaders talked about the Trello and its cards. After a meeting with Chris, Niklas and David shared what was discussed in that meeting. Niklas met with the master students that are constructing a similar project and shared similarities between the projects. Emmeli is now the customer account manager and the preparation of an e-mail to Simon began.

Group leaders 7: Meeting minutes

Meeting 6: Group Leaders

February 14th, 2017

The group leaders discussed the PPD-grade. Chris had mentioned an other group constructing a similar project, Niklas will have a meeting with them. The SRS, Trello and Sprint were also discussed. A contingency plan if some group members left the group.

See more:  Group leaders 6

tisdag 7 februari 2017

Meeting 5: Group Leaders

February 7th, 2017

During the meeting the current sprint was discussed. The group discussed parsing alternatives and whether or not KTH Architecture courses should be integrated in the project (update: they do not need to be included). A mid-term evaluation of the project will be posted so that feedback can be collected, in order to work more effectively in the future. There is a template for the SRS-documentation posted on drive, so that the group continuously can document the progress. A Doodle has been posted ahead of a possible extracurricular activity.

In more detail: Group leader 5

Meeting 4: Whole Group

1st of February 2017

During the forth group meeting several items were discussed. The group talked about the Trello page and who should move items to show the progression. The PPD was sent to supervisor Chris and Karl and the group felt content with the result. The next part of the meeting was dedicated to the next sprint were members happily accepted tasks and were given the option to access whatever part of the sprint they wanted.

Group meeting 4: Minutes

Meeting 4: Group Leaders

30th of January
During the meeting the group leaders discussed PPD feedback ahead of the coming deadline. It was decided that Niklas and Jonathan would give the five minute presentation where they would talk about our project. The planning of the next sprint commenced and the group leaders discussed how to draw up the upcoming weeks. Roles were also proposed as a preliminary distribution plan.

Meeting minutes: Group leader meeting 4